Back to all products
Product 06 / 08

Air Receivers

Robust high-pressure air storage tanks designed to absorb compressor pulsations and stabilise supply.

Industrial pipework
Manufacturing floor
Welding operation

Robust high-pressure air storage tanks designed to absorb compressor pulsations and stabilise supply.

How we build it

Every unit starts from a process datasheet and is validated against the applicable code before fabrication.

Specifications
Pressure range 6 – 75 Kgf/cm²Volumes 0.25 – 90 m³ASME U-Stamp certified
Applications
Manufacturing plantsAutomotivePharmaceuticalHVAC systems
Materials
SS 304SS 316SA 516 Gr B
Always included

Engineering services included.

  1. 01Detailed mechanical design with FEA review.
  2. 02Mill-to-shop material traceability.
  3. 03Third-party inspection and code stamping.
  4. 04QA dossier and as-built drawings on despatch.
Benefits

Why teams choose us.

  • Smooths compressor pulsations
  • Reduces power consumption
  • Custom nozzle options

Constructed to code

Compliance & standards.

Every vessel, exchanger and skid we ship is engineered, fabricated and inspected to internationally recognised pressure-equipment codes.

ASME Section VIII Div 1ASME U-Stamp
Frequently asked

Questions buyers ask first.

What sizes can R&D Therm fabricate?

We can fabricate equipment up to 4.5 m in shell diameter, 33 m in overall length and 42 MT single-piece weight.

Which codes and certifications do you build to?

We are ASME U-Stamp certified for pressure vessels, IBR-approved for boilers and steam pressure parts, and routinely build to PED (CE marked) for European exports.

Do you handle exotic-alloy fabrication?

Yes — titanium, Hastelloy C-22 / C-276, duplex and super-duplex stainless steels, Sanicro 28 and 904L are routine work for our welding division.

What is your typical delivery timeline?

Standard pressure vessels and heat exchangers typically ship in 12–16 weeks. Larger columns, reactors and skids ship in 16–22 weeks.

Do you provide third-party inspection support?

Yes — we work routinely with Lloyd's Register, BV, TUV, DNV, SGS and customer-nominated inspection agencies.

Can you offer site erection and commissioning support?

We routinely send engineers to site for erection supervision, hydro / loop checking and commissioning support.

Web → Case Studies: If a case study is updated from the Admin panel while the same case detail page

Web → Case Studies: If a case study is updated from the Admin panel while the same case detail page is open on the web, then upon refreshing the page, a 404 error is displayed. Web → Case Studies: If a case study is updated from the Admin panel while

gffd ghfh tg htg hg hg

hg h gfh g hgf hfg hfg fgh

Build with R&D Therm

Talk to an engineer about your air receivers enquiry.